249 Springbrook Drive Open Sunday, September 15 from 2-4 p.m.Hot SpringsArkansasUSA71913
العقارات منزل عائلة واحدة المخصصة لغرض البيع كائنة في249 Springbrook Drive Open Sunday, September 15 from 2-4 p.m. Hot Springs Arkansas 71913 USA 4غرف النوم, 4 الحمامات حاليًاالبيع،249 Springbrook Drive Open Sunday, September 15 from 2-4 p.m. Hot Springs Arkansas 71913 USA مدرجة لـUS$ 819,900. إذا كان العقار يقع في249 Springbrook Drive Open Sunday, September 15 from 2-4 p.m. Hot Springs Arkansas 71913 USA فإنه ليس ما تبحث عنه، ابحث في Arkansas العقارات للاطّلاع علىمنازل أخرى، بغرضالبيع الكائنة فيHot Springs .
رقم تعريف العقار: 24011522
US$ 819,900 USD
- النوع
- عائلة واحدة
- غرف النوم
- 4
- الحمامات
- 4
- المنزل/مساحة مخصصة
- 263m² (2,830ft²)
سمات العقار
السمات الرئيسية
تفاصيل الإنشاء
- سنة البناء
- 2023
- حالة المبنى
- propDet.condition.newConstruction
- تسقيف
- roofType.CompositionShingle
- الطراز
- homeStyle.traditional
ميزات أخرى
- سمات العقار
- Separate laundry roomPorchGarageFireplace
المساحة
- حجم العقار
- 263m² (2,830ft²)
- غرف النوم
- 4
- الحمامات
- 4
- نظام التبريد
- Central A/C
الوصف
Spring is almost here and this COVERED BOAT DOCK comes with a beautiful new custom built home currently under construction! Water views from every level and spacious 4 bedroom, 3.5 bath will accommodate all your guests. Downstairs is perfect for entertaining and has a living area, two bedrooms, a bunkroom and two full baths. Main level holds the open concept living/kitchen/dining areas as well as the primary bedroom/bath, laundry room and 1/2 bath at entryway. Enjoy the outside from both levels on the full length covered porches. Builder has plans for premium luxury vinyl flooring, quartz counter tops in the kitchen, granite in the other wet areas and a place to hang your bags, coats and other items as you enter the home from the garage. And did I mention the large laundry/pantry combination? It's oversized with a lot of custom cabinets. This one will be trimmed out to impress upon entering. Estimated completion date late April or mid May. Interior paint to be finished this week, then tile work begins. Brick will be painted and driveway installed soon. We can get this one closed in time for you to enjoy the views and the lake this summer! See agent remarks.