Labin Labin, Istarska Županija 52231, クロアチア
寝室数:5, バス・トイレ数:3, 日当たり良好 付き Labin Labin Istarska Županija 52231 クロアチア にある 売買 の 住宅 は現在 売買 のため、Labin Labin Istarska Županija 52231 クロアチア は $782,268 で出品されています。 Labin Labin Istarska Županija 52231 クロアチア にある物件が探しているものではない場合は、 クロアチア 不動産 を検索して、Labin にある 売買 の他の 住宅 をご覧ください 。
MLS登録番号: 101200-207
$782,268 USD
€750,000 EUR
- 寝室数
- 5
- バス・トイレ数
- 3
- 家屋/敷地面積
- 198m²
物件の特徴
主な特徴
建物の詳細
- 建築年
- 2024
- 建物の状態
- 新築
- 様式
- 日当たり良好
広さ
- 物件の広さ
- 198m²
- 土地/分譲地の面積
- 779m²
- 寝室数
- 5
- バス・トイレ数
- 3
- 部屋数の合計
- 8
- 冷房装置
- セントラル
- 暖房装置
- 電気
物件の概要
LABIN, SURROUNDINGS, GROUND FLOOR WITH SWIMMING POOL SURROUNDED BY GREENERY
We are selling a new one-story house that is in the Roh-bau phase and is being sold completely finished as in the photos, with an area of 198 m2, consisting of two residential units.
The first residential unit with an area of 50 m2 consists of an entrance hall, a kitchen with a living room and a dining room, three bedrooms, two bathrooms, a storage room.
The second residential unit has an area of 101 m2 and consists of an entrance hall, a kitchen with a living room and a dining room, two bedrooms and a bathroom.
The house is fully equipped and furnished, built with top quality materials, thermal facade 12 cm thick, top quality ceramics and sanitary ware, aluminum carpentry with automatic blinds and mosquito nets.
The house has electric underfloor heating, a chimney with the option of installing a fireplace, and is fully air-conditioned.
The yard is landscaped and formed with an area of 779 m2, where there is a swimming pool of 34 m2, a sun deck, and a barbecue.
The house was designed and formed as a smaller resort of three similar houses that have their own entrance and access road owned only by the owners of the listed properties.
The resort is equipped with video surveillance and has a 200 m2 children's playground, which can only be used by house owners.
A very beautiful and interesting story, designed in such a way as to provide the new owner with peace, relaxation in untouched nature and yet close to all vital amenities.
Construction completion scheduled for February 2025.