Rovinj Rovinj, Istarska Županija, 크로아티아
CENTURY 21 Futura에서 추가했습니다
Rovinj, Istarska Županija, 크로아티아 내 판매용주택이(가) 현재 판매용입니다. Rovinj, Istarska Županija, 크로아티아이(가)US$893,217(으)로 추가되었습니다. 이 부동산은침실4개 , 욕실3개 , 화창한이(가) 특징입니다. Rovinj, Istarska Županija, 크로아티아 내 부동산이 마음에 들지 않는다면, https://www.century21global.com 을(를) 방문하여 다른 Rovinj 내 판매용 주택을(를) 찾아보세요 。
업데이트된 일자: 2025. 2. 1.
MLS 번호: 101200-96
US$893,217 USD
€862,000 EUR
- 침실4
- 욕실3
- 집/대지 크기171m²
부동산 사양
주요 사양
- 화창한
건축 상세정보
- 건축 연도: 2024
- 건물의 상태: 신축
- 건물 스타일: 화창한
기타 사양
- 부동산 사양: 테라스 발코니 엘리베이터 지하실
- 냉각 시스템: 중앙식
- 난방 시스템: 전기 개스
지역
- 부동산 크기: 171m²
- 침실: 4
- 욕실: 3
- 전체 방 개수: 7
묘사
ROVINJ, EXCLUSIVE NEW BUILDING ONLY 150 METERS FROM THE SEA
We are selling a new two-story apartment with a net usable area of 170.54 m2, which with terraces, storage and garages has a coefficient of 210.11 m2.
The apartment is a very high-quality new building and is located only 150 meters from the beach and the sea.
The apartment consists on the first floor of an entrance hall, a kitchen with an open-plan dining room and living room, an entrance hall, two comfortable bedrooms, two bathrooms, a small storage room, a spacious and sunny terrace, and the second floor, which is reached by an internal staircase and consists of an entrance hall, two comfortable bedrooms, one bathroom and a terrace that is intimate and sunny and suitable for sunbathing and the like.
In the basement of the residential building there are garages and a storage room, and the mentioned apartment has a storage area of 10.16 m2 and two garages.
The apartments are fully air-conditioned, equipped with city gas underfloor heating, large-format high-quality ceramics and parquet flooring.
The apartment also has security doors, aluminum joinery with electric blinds, mosquito nets, video intercom.
The thermal insulation is a 10 cm thick stone wool thermal facade, all balconies and terraces are surrounded by a glass fence, and the garages are connected to the apartment by an internal staircase and elevator.
It is sold completely finished and the expected completion of the works is 6/2024.
Top quality construction and all components built into the apartment.