Labin Labin, Istarska Županija 52231, 크로아티아
침실 5개 , 욕실 3개, 화창한가 있는 Labin Labin Istarska Županija 52231 크로아티아 에 위치한 판매 의 주택 은 현재 판매 에, Labin Labin Istarska Županija 52231 크로아티아 은 US$788,266에 등록되어 있습니다. Labin Labin Istarska Županija 52231 크로아티아 에 위치한 부동산이 찾고 있는 것이 아닌 경우 크로아티아 부동산 를 검색하여 Labin 의 판매 에 대한 다른 주택들을 확인하십시오 .
MLS 번호: 101200-207
US$788,266 USD
€750,000 EUR
- 침실
- 5
- 욕실
- 3
- 집/대지 크기
- 198m²
부동산 사양
주요 사양
건축 상세정보
- 건축 연도
- 2024
- 건물의 상태
- 신축
- 건물 스타일
- 화창한
지역
- 부동산 크기
- 198m²
- 땅/대지 크기
- 779m²
- 침실
- 5
- 욕실
- 3
- 전체 방 개수
- 8
- 냉각 시스템
- 중앙식
- 난방 시스템
- 전기
묘사
LABIN, SURROUNDINGS, GROUND FLOOR WITH SWIMMING POOL SURROUNDED BY GREENERY
We are selling a new one-story house that is in the Roh-bau phase and is being sold completely finished as in the photos, with an area of 198 m2, consisting of two residential units.
The first residential unit with an area of 50 m2 consists of an entrance hall, a kitchen with a living room and a dining room, three bedrooms, two bathrooms, a storage room.
The second residential unit has an area of 101 m2 and consists of an entrance hall, a kitchen with a living room and a dining room, two bedrooms and a bathroom.
The house is fully equipped and furnished, built with top quality materials, thermal facade 12 cm thick, top quality ceramics and sanitary ware, aluminum carpentry with automatic blinds and mosquito nets.
The house has electric underfloor heating, a chimney with the option of installing a fireplace, and is fully air-conditioned.
The yard is landscaped and formed with an area of 779 m2, where there is a swimming pool of 34 m2, a sun deck, and a barbecue.
The house was designed and formed as a smaller resort of three similar houses that have their own entrance and access road owned only by the owners of the listed properties.
The resort is equipped with video surveillance and has a 200 m2 children's playground, which can only be used by house owners.
A very beautiful and interesting story, designed in such a way as to provide the new owner with peace, relaxation in untouched nature and yet close to all vital amenities.
Construction completion scheduled for February 2025.