Rovinj Rovinj, Istarska Županija 52210, 크로아티아
침실 4개 , 욕실 3개, 화창한가 있는 Rovinj Rovinj Istarska Županija 52210 크로아티아 에 위치한 판매 의 주택 은 현재 판매 에, Rovinj Rovinj Istarska Županija 52210 크로아티아 은 US$898,525에 등록되어 있습니다. Rovinj Rovinj Istarska Županija 52210 크로아티아 에 위치한 부동산이 찾고 있는 것이 아닌 경우 크로아티아 부동산 를 검색하여 Rovinj 의 판매 에 대한 다른 주택들을 확인하십시오 .
MLS 번호: 101200-96
US$898,525 USD
€862,000 EUR
- 침실
- 4
- 욕실
- 3
- 집/대지 크기
- 171m²
부동산 사양
주요 사양
건축 상세정보
- 건축 연도
- 2024
- 건물의 상태
- 신축
- 건물 스타일
- 화창한
기타 사양
- 부동산 사양
- 테라스발코니엘리베이터지하실
지역
- 부동산 크기
- 171m²
- 침실
- 4
- 욕실
- 3
- 전체 방 개수
- 7
- 냉각 시스템
- 중앙식
- 난방 시스템
- 전기개스
묘사
ROVINJ, EXCLUSIVE NEW BUILDING ONLY 150 METERS FROM THE SEA
We are selling a new two-story apartment with a net usable area of 170.54 m2, which with terraces, storage and garages has a coefficient of 210.11 m2.
The apartment is a very high-quality new building and is located only 150 meters from the beach and the sea.
The apartment consists on the first floor of an entrance hall, a kitchen with an open-plan dining room and living room, an entrance hall, two comfortable bedrooms, two bathrooms, a small storage room, a spacious and sunny terrace, and the second floor, which is reached by an internal staircase and consists of an entrance hall, two comfortable bedrooms, one bathroom and a terrace that is intimate and sunny and suitable for sunbathing and the like.
In the basement of the residential building there are garages and a storage room, and the mentioned apartment has a storage area of 10.16 m2 and two garages.
The apartments are fully air-conditioned, equipped with city gas underfloor heating, large-format high-quality ceramics and parquet flooring.
The apartment also has security doors, aluminum joinery with electric blinds, mosquito nets, video intercom.
The thermal insulation is a 10 cm thick stone wool thermal facade, all balconies and terraces are surrounded by a glass fence, and the garages are connected to the apartment by an internal staircase and elevator.
It is sold completely finished and the expected completion of the works is 6/2024.
Top quality construction and all components built into the apartment.