Rovinj Rovinj, Istarska Županija, 克罗地亚
列出者 CENTURY 21 Futura
位于 Rovinj, Istarska Županija, 克罗地亚 待售的 家 为目前正在出售 Rovinj, Istarska Županija, 克罗地亚 已为 US$1,088,737 列出。 此属性具有 4 卧室 , 3浴室 , 海景, 光亮 功能。 如果位於Rovinj, Istarska Županija, 克罗地亚的物業不是您正在尋找的,請訪問 https://www.century21global.com ,查看在 Rovinj的其他待出售的 家园 。
最新日期: 2025年2月5日
MLS#: 101200-98
US$1,088,737 USD
€1,047,000 EUR
- 卧室4
- 浴室3
- 房屋/场地面积170m²
房产特点
特色
- 海景
- 光亮
建造详情
- 建造于: 2024
- 房屋状况: 新建筑
- 风格: 光亮
其他特征
- 房产特点: 露台 阳台 电梯 地下室
- 冷却系统: 中央
- 供暖系统: 电能 燃气
面积
- 房产面积: 170m²
- 卧室: 4
- 浴室: 3
- 房间总数量: 7
描述
ROVINJ, EXCLUSIVE TWO-FLOOR APARTMENT WITH SEA VIEW AND ROVINJ ONLY 150 METERS FROM THE SEA
We are selling a new two-story apartment with a net usable area of 170.03 m2, which with terraces, storage and garages has a coefficient of 209.64 m2.
The apartment is a very high-quality new building and is located only 150 meters from the beach and the sea with a sea view.
The apartment consists on the first floor of an entrance hall, a kitchen with an open-plan dining room and living room, an entrance hall, two comfortable bedrooms, two bathrooms, a small storage room, a spacious and sunny terrace, and the second floor, which is reached by an internal staircase and consists of an entrance hall, two comfortable bedrooms, one bathroom and a terrace that is intimate and sunny and is suitable for sunbathing and the like and has an open view of the sea and the town of Rovinj.
In the basement of the residential building there are garages and a storage room, and the mentioned apartment has a storage area of 5.67 m2 and two garages.
The apartments are fully air-conditioned, equipped with city gas underfloor heating, large-format high-quality ceramics and parquet flooring.
The apartment also has security doors, aluminum joinery with electric blinds, mosquito nets, video intercom.
The thermal insulation is a 10 cm thick stone wool thermal facade, all balconies and terraces are surrounded by a glass fence, and the garages are connected to the apartment by an internal staircase and elevator.
It is sold completely finished and the expected completion of the works is 6/2024.
Top quality construction and all components built into the apartment.