Labin Labin, Istarska Županija, 克罗地亚
列出者 CENTURY 21 Futura
位于 Labin, Istarska Županija, 克罗地亚 待售的 家 为目前正在出售 Labin, Istarska Županija, 克罗地亚 已为 US$780,640 列出。 此属性具有 5 卧室 , 3浴室 , 光亮 功能。 如果位於Labin, Istarska Županija, 克罗地亚的物業不是您正在尋找的,請訪問 https://www.century21global.com ,查看在 Labin的其他待出售的 家园 。
最新日期: 2025年1月27日
MLS#: 101200-207
US$780,640 USD
€750,000 EUR
- 卧室5
- 浴室3
- 房屋/场地面积198m²
房产特点
特色
- 光亮
建造详情
- 建造于: 2024
- 房屋状况: 新建筑
- 风格: 光亮
其他特征
- 冷却系统: 中央
- 供暖系统: 电能
面积
- 房产面积: 198m²
- 土地/地块面积: 779m²
- 卧室: 5
- 浴室: 3
- 房间总数量: 8
描述
LABIN, SURROUNDINGS, GROUND FLOOR WITH SWIMMING POOL SURROUNDED BY GREENERY
We are selling a new one-story house that is in the Roh-bau phase and is being sold completely finished as in the photos, with an area of 198 m2, consisting of two residential units.
The first residential unit with an area of 50 m2 consists of an entrance hall, a kitchen with a living room and a dining room, three bedrooms, two bathrooms, a storage room.
The second residential unit has an area of 101 m2 and consists of an entrance hall, a kitchen with a living room and a dining room, two bedrooms and a bathroom.
The house is fully equipped and furnished, built with top quality materials, thermal facade 12 cm thick, top quality ceramics and sanitary ware, aluminum carpentry with automatic blinds and mosquito nets.
The house has electric underfloor heating, a chimney with the option of installing a fireplace, and is fully air-conditioned.
The yard is landscaped and formed with an area of 779 m2, where there is a swimming pool of 34 m2, a sun deck, and a barbecue.
The house was designed and formed as a smaller resort of three similar houses that have their own entrance and access road owned only by the owners of the listed properties.
The resort is equipped with video surveillance and has a 200 m2 children's playground, which can only be used by house owners.
A very beautiful and interesting story, designed in such a way as to provide the new owner with peace, relaxation in untouched nature and yet close to all vital amenities.
Construction completion scheduled for February 2025.